How Tesla Cut Harness Production from 14 Days to 52 Hours
The secret isn’t expensive robots – it’s smarter planning. Here’s how Tier 1 suppliers like Aptiv achieved this:
Hack 1: The 24-Hour Raw Material Vault
- Stockpile essentials within 50 miles:
- 10 most common wire gauges
- Top 5 connector types (Deutsch, Molex, etc.)
- Cost impact: 18kinventory→saves18kinventory→saves120k/month in delays
Hack 2: Color Coding Revolution
- Instead of 12 colors: Use striped tapes
- Example: Red + blue stripe = CAN High
- Cuts labeling time by 70%
Hack 3: Pre-Terminated Wires
- Buy wires pre-cut/stripped from vendors like TE Connectivity
- Trade-off: Costs 9% more but saves 3 hours/assembly
Hack 4: The Priority Pyramid
- Split orders into:
- Rush (pay 30% extra): 48h turnaround
- Standard: 5 days
- Batch: 2 weeks (discounted)
Hack 5: Digital Approval Loops
- Use Slack/MS Teams for real-time sign-offs
- Example: Ford reduced approval time from 6 days → 9 hours
Hack 6: Localized Testing Partners
- Partner with regional labs instead of shipping overseas
- Tesla’s move: Use 8 UL-certified labs across Mexico
Hack 7: The “Good Enough” Philosophy
- Relax tolerances on non-critical parts:
- Wire length ±5mm instead of ±1mm
- Connector alignment 90° instead of 88°
Lead Time Calculator
Input your current process to see potential savings:
Step | Current Time | Improved Time |
---|---|---|
Material sourcing | 6 days | 1 day |
Assembly | 3 days | 18 hours |
Testing | 2 days | 4 hours |
Total | 11 days | 1.8 days |